PMRDA Building Permission Pune 2026: Process, Fees, Timeline & Online Portal
PMRDA (Pune Metropolitan Region Development Authority) governs the metropolitan ring outside PMC and PCMC: Hinjewadi, Wagholi, Mundhwa fringe, Manjri, Sus, Nande, the eastern Pune corridor. PMRDA is a two-stage permission process - development permission first, then building permission - and the timelines are longer than PMC/PCMC. Below: the 2026 process, the documents, the fees, the realistic timelines, and the common rejections.

1. PMRDA jurisdiction - is your plot inside?
PMRDA covers the metropolitan ring outside PMC and PCMC limits: Hinjewadi, Marunji, Wakad fringe, Baner fringe, Sus, Nande, Manjri, Mundhwa-Kesnand corridor, Wagholi, Kharadi fringe, Charholi, Alandi fringe. Confirm from the 7/12 document — the 'विकास प्राधिकरण' line names the authority. MIDC-adjacent plots have their own overlay rules — confirm from the development plan, not from the marketing brochure.
2. The two-stage PMRDA process
- 01Stage 1 - Development Permission (DP)Establishes the layout, road access, FSI applicable to the plot, common areas, plot boundaries, height zone. For a residential bungalow on a single plot, the DP is a pre-check; for a layout project, it is the bigger stage.
- 02Stage 2 - Building Permission (BP)The actual construction sanction - same drawings as PMC/PCMC but reviewed under PMRDA's own DC rules. The two stages are sequential, not parallel - total timeline is 4–7 months from first submission, not 1–3.
3. Documents you need for a PMRDA permission
- 7/12 extract (current, within 6 months)
- NA order (if applicable - most PMRDA plots are converted from agricultural)
- sanctioned layout
- architectural drawings (site plan, all floor plans, elevations, sections) by a registered architect
- structural drawings + stability certificate
- soil test report
- ownership chain documents
- the 7/12 + 8A + Ferfar check
- a Tree NOC if there are existing trees on the plot
4. Fees and timelines (2026)
PMRDA scrutiny fees are nominal; the bigger costs are the development charges (~1% of construction cost for residential) and the premium FSI charge (per sqft of excess FSI). For a 1,500 sqft G+1 plot, total statutory costs range from ₹80,000–1.4 lakh.
Timeline: 4–7 months total for both stages when the drawings are clean. PMRDA is slower than PMC/PCMC by design—the development plan review involves a deeper check.
5. Why PMRDA permissions get rejected (the five usual reasons)
- 011. NA Order Missing or StaleThe most common cause of PMRDA permission rejections is a missing or outdated NA (Non-Agricultural) order.
- 022. FSI Consumed Beyond Sanctioned LimitExceeding the Floor Space Index (FSI) limit sanctioned in the layout plan can lead to rejection.
- 033. Setbacks Under PMRDA's DC RuleSetbacks must comply with PMRDA's Development Control (DC) rules, which are stricter than PMC regulations in certain areas.
- 044. Tree NOC MissingA Missing No Objection Certificate (NOC) for trees on the site can result in permission denial.
- 055. Development Plan InconsistencyThe architect's site plan must align with the layout plan; any discrepancies lead to rejection.
6. How we run PMRDA permissions
We prepare the drawings to PMRDA DC rules in-house, run the pre-submission check, file on the e-approval portal, handle both stages, and track the file to sanction. The PMRDA cost and timeline are quoted upfront at planning - before the construction contract.
Real questions, real answers.
How long does PMRDA building permission take in 2026?
+
4–7 months total for both stages (development permission + building permission) from clean submission. The DP stage alone is 2–4 months. Faster with a registered architect who knows the PMRDA DC rules.
What is the PMRDA building permission fee?
+
For a 1,500 sqft G+1 plot: total statutory ~₹80,000–1.4 lakh including scrutiny fees, development charges (~1% of construction cost), and any premium FSI charge. Larger plots scale linearly.
Do I need PMRDA permission if my plot is in a sanctioned layout?
+
Yes - even inside a sanctioned layout, the building construction itself needs PMRDA's building permission stage. The layout's DP is the umbrella; your building is the individual sanction.
Is Hinjewadi under PMRDA?
+
Yes - almost all residential Hinjewadi is PMRDA. MIDC-adjacent pockets have their own overlay rules. Confirm zone from the 7/12 plus the development plan before budgeting time.
Can I start construction before PMRDA permission?
+
No. Construction without PMRDA's sanctioned plan and Commencement Certificate is unauthorised - it invites stop-work notices, MRTP-Act compounding penalties, and at the extreme end, demolition. The CC comes before excavation.
What is the difference between PMRDA and PMC/PCMC permission?
+
PMRDA is the metropolitan development authority for the Pune ring outside PMC and PCMC; the process is two-stage (DP + BP) instead of one, and the timelines are longer (4–7 months vs 1–3). Fees are typically lower.
- Deemed NA Permission Maharashtra | When a Plot Is Treated as Non-Agricultural
- Index II Pune | SRO Document Status, Sale Deed & How to Check Online
- Building Permission Maharashtra Online | Apply, Track & Status
- Occupancy Certificate Pune | Apply Online, Documents & Timeline
- RERA Registration Builders List | Verify Before You Book in Maharashtra
Next step