Building Permission Maharashtra Online — Apply, Track & Status

Building permission in Maharashtra is now mostly online. Here is the step-by-step process for Pune, Pimpri-Chinchwad, and Mumbai — forms, fees, and timeline.

8 min read·8 Sept 2026·Arsa Construction

1. Who needs permission

Any new construction, extension, alteration, or change of use in Maharashtra. Even minor alterations (partition walls, balcony enclosure) need BMC/PCMC approval in urban areas.

2. Online application

Pune: mahamcin.gov.in → Building Permission → New Application. Pimpri-Chinchwad: pcmconline.gov.in. Mumbai: mumbainoc.gov.in. Upload: plot deed, society NOC, architect drawings, soil test, and FEED plan.

3. Fees

Pune: ₹500–5,000 based on area and type. PMC: 0.1% of built-up area value. PCMC: 0.15%. Mumbai: 0.2%. Plus development charges (Pune: ₹100–200/sq ft).

4. Timeline

Pune: 15–30 days for sanction. Pimpri-Chinchwad: 15–25 days. Mumbai: 30–60 days. Objection period is 15 days; if no objection, sanction is auto-approved.

5. Common rejection reasons

Missing soil test report, incorrect plot dimensions, no architect stamp, setback violations, and FSI exceedance. Check the PMC checklist before applying.

6. After sanction

Start construction within 6 months. File commencement form. Monthly inspection by engineer. Completion certificate required before occupancy.

FAQ

Real questions, real answers.

How do I apply for building permission in Pune online?

+

Go to mahamcin.gov.in → Building Permission → New Application. Upload plot deed, drawings, soil test, and FEED plan.

What is the fee for building permission in Pune?

+

₹500–5,000 based on area plus development charges ₹100–200/sq ft.

How long does building permission take?

+

15–30 days in Pune, 30–60 days in Mumbai.