Sample PDF quotation

What a real ARSA quotation looks like - line-itemed, milestone-scheduled, with delay-penalty clause.

Architectural elevation study - PDF construction quotation tool
Architectural elevation study - PDF construction quotation tool

Build Desk · Sample

A real ARSA quotation

What a line-itemed, milestone-scheduled, delay-penalty-clause quotation actually looks like.

  • Rate₹3900/sqft
  • Scope factor100%
  • Total₹78,00,000

Click any group to expand its line items.

This is sample data - actual quotations are on letterhead, signed, and dated.

Live result

Grand total

premium · turnkey

₹76,20,600

2,000 sqft × ₹3900 × 1 · all-in

Excavation + PCC

1:4:8 nominal mix · 360 cuft · ₹65/cuft

₹2,34,000

RCC (M20 designed mix)

OPC 53, cube-tested · 900 cuft · ₹280/cuft

₹16,38,000

Steel (Fe 500D TMT)

BIS certified, MTC · 8400 kg · ₹78/kg

₹10,14,000

Brickwork (wire-cut clay)

1:6 cement mortar · 16000 cft · ₹65/cft

₹5,46,000

Includes

Written milestone schedule (5 stages)

Delay-penalty clause (0.05% per day)

1-year defect-liability commitment

As-built drawings + material test certificates

Next step

Get a real one for your plot

After a free site visit, we share a line-itemed quotation on letterhead with a milestone schedule.

Common questions

About this tool

Or ask Arsa AI in the dock at the bottom of the page - it has the latest Pune & Baramati cost data and the live permission regime for every area.

WhatsApp a builder

Is this tool free?

+

Yes - every tool on the ARSA Build Desk is free, no signup, no email gate.

How accurate is the result?

+

Indicative, within ±10–15% for the standard scenarios. After a free site visit, our written line-itemed quotation is accurate to the last labour-day.

Do you cover Pune and Baramati?

+

Both. We also cover the wider Pune metro, the Baramati district, and selected parts of western Maharashtra.

How do I get a real quotation?

+

WhatsApp us or fill the contact form. We do a free 90-minute site visit, a feasibility study, and a written line-itemed quotation with a milestone schedule.