A central courtyard bungalow on a 3,200 sqft plot in MIDC, planned around the family's morning routine.

Plot area

3,200 sqft

Built-up

2,800 sqft · G+1

Duration

9 months

Spec

Standard finish

Courtyard bungalow, Baramati - completed by Arsa Construction

The brief was deceptively simple: a G+1 with a central courtyard, two bedrooms upstairs, one bedroom downstairs for the parents, and a sit-out that opens into the courtyard. We worked the plan around the courtyard, not the other way around. The result is a home where every room sees the courtyard, the morning light reaches the kitchen, and the parents don't have to climb stairs to reach their room.

The structural design uses AAC blocks for the external walls (better thermal performance for Baramati's hot summers) and wire-cut brick for the internal. The roof is a standard RCC slab, with a sloping sheet roof over the courtyard for shade and rain protection. The plumbing is CPVC throughout, with a 1,000-litre overhead tank and a 5,000-litre underground sump - sized for a four-person family with a 4-day backup.

On handover, the family got a complete file: as-built drawings, material test certificates, electrical and plumbing test reports, manufacturer warranties, and a written 1-year defect-liability commitment.

Highlights

What this project got right.

  • ·Central courtyard with sloping sheet roof
  • ·Parents' bedroom on the ground floor
  • ·Two bedrooms, study and family lounge upstairs
  • ·AAC block external walls for thermal performance
  • ·Standard finish, 9 months, on budget
Materials

What it was built with.

  • OPC 53 cement
  • Fe 500D TMT
  • AAC blocks (external)
  • Wire-cut clay brick (internal)
  • Vitrified floor tiles
  • Granite kitchen counter
  • Asian Paints Ace exterior

Case-study FAQ

Real questions, from this project.

What is the cost of a courtyard bungalow in Baramati?

+

For a 2,800 sqft G+1 courtyard bungalow on a 3,200 sqft plot in MIDC, the total project cost was around ₹78 lakh for a standard finish, including all interiors and the courtyard roof.

How long did the build take?

+

9 months from breaking ground to handover, on the committed milestone schedule. We share a milestone schedule at contract, with a written delay-penalty clause.

Do you handle BMC building permission for MIDC plots?

+

Yes - the BMC sanction, the MIDC NOC (where applicable), and the entire file and follow-up cycle.